Time to sum up what needs to be done.
This aint the order of doing it.
1. Battery Relocation, trunk.
2. Fuelpump rewire(will be done when ive done 1.)
3. Installing OEM Scirocco Radiator.
4. Fixing the fan wiring.(comes after 3.)
5. Installing AEM Wideband.
6. Installing Aeromotive FPR.(ty to thedsmguy for selling me his)
7. Installing ECMLink.(if I can get someone to sell me 1)
8. Maintenance on brakes
9. New Tires.(and possible rims)
10. Mount Intercooler that will fit without cutting bumper.
11. New Intercooler piping.
12. Install Evo8 MAF
13. Install Evo8 Injectors.
14. New oilcooler with AN fittings ect.
15. Exhaust 2½ catback SS.
16. Evo seats if I can ever find some brackets.
17. Get gauges for oil press/temp, boost and fuel press.
Prolly forgot some stuff, but thats about what im gonna do hopefully this summer.